Muskoka Paramedic Services Station 3 is a 7,923 sq. ft. emergency services facility in Port Carling, Ontario. The project used Amvic™ ICF for 100% of the exterior and foundation walls, helping create a high-performance building envelope for a critical community facility.

The $4.3 million project used 15,822 sq. ft. of ICF and was completed within a 42-week construction schedule. ICF installation took 56 days. Amvic™ ICF was selected for energy efficiency, durability, and post-disaster facility design.

Muskoka Paramedic Services Station 3 was recognized as the 2026 ICF Builder Awards light commercial 1st runner-up.

Q&A

Q. What was the major benefit of using Amvic™ ICF over traditional construction methods?

A. “The use of Amvic™ ICF for the foundation and walls played a key role in addressing this challenge. Not only did ICF construction contribute to controlling costs, but it also provided superior building efficiency, durability, and energy performance, which reduces long-term operating expenses for the client. This sustainable approach benefited both the contractor, by streamlining construction, and the end user / client, by delivering a more efficient and comfortable facility.”

Distributor Quote

“The Amvic™ ICF brand was selected after a careful evaluation of cost, lead times, and product availability, including the range of accessories that support efficient installation and accommodate the specific design details of this project. Alleguard was chosen as the preferred supplier due to their reliable technical support, efficient service, and prompt delivery, ensuring a smooth and successful construction process.”

– Jon Morton, Distributor